Once the audit targets have been selected, the next step is to coordinate the audit schedule with the respective sites. Typically, audits are conducted either midway through the clinical trial or at its conclusion.Key points for scheduling:Notification Timeline:Provide the site with at least one week’s notice before the audit. This allows sufficient time for preparation.Midpoint or End-of-Study ..